The Foundation Pile Testing BD Diaries
In this method, a round hole is excavated up into the depth at which the soil will stand unsupported (about 0.5m for smooth clay and 2m for stiff clay). Vertical boards referred to as laggings, are then established in position throughout the excavated deal with and they are held tightly towards the soil by steel rings.Pile Installation: Specify the